Galleria Mall, London

  • Completed 2007
  • 73,400 sq. ft. roof replacement
  • Built Up Roof System
  • Fully tapered roof design
  • Downtown London with very limited access
  • Occupied facility, maintained public access
  • Winter conditions
  • Co-ordination with GC and other trades

Robarts School, London

  • Completed in two phases 1995 and 2006
  • 125,600 sq. ft. roof replacement
  • Built Up Roof System
  • Sloped steel roof system
  • Metal siding
  • Winter conditions
  • School occupied during roof replacement process
  • Safety setup geared toward hearing impaired students

TDL Warehouse, Guelph

  • Completed 2005
  • 155,300 sq. ft. new construction
  • Three different roof systems – built up, white EPDM and fully adhered PVC
  • Warehouse and freezer
  • Part of the building is over 100 feet tall – susceptible to high winds

Loblaws Warehouse, Mississauga

  • Completed 2005
  • Two buildings total 515,800 sq. ft. roof replacement
  • Two roof systems- torch applied modified and EPDM
  • Up to 50 employees on site at once to meet schedule
  • Extensive safety setup and traffic control
  • Facility continued to operate during roof replacement
  • Winter conditions