Home Hardware, Elmira and St. Jacobs

  • Completed 2016
  • 212,500 sq. ft. roof replacement
  • TPO roof system
  • Occupied building during roof replacement
  • Maintained public access
  • Maintenance services on all Home Hardware warehouses

Go Transit, Streetsville

  • Completed 2008
  • 200,600 sq. ft. new construction
  • TPO roof system
  • Included 10,200 sq. ft. green roof
  • White membrane for energy efficiency
  • LEED accredited building

Bauer Lofts, Waterloo

  • Completed 2008
  • 58,200 sq. ft. roof replacement
  • Historic building downtown Waterloo
  • Limited access to site
  • Roof replacement combined with new high rise construction
  • Built Up and Hot Rubberized Roof Systems
  • Hot rubber applied to walk out balconies topped with insulation and patio stones

Stratford Residence

  • Completed 2008
  • 3,000 sq. ft.
  • Sloped steel tile roof
  • Manufactured steel tiles in Nedlaw fabrication shop

Sisters of St. Josephs, London

  • Completed 2007
  • 41,600 sq. ft. new construction
  • Torch applied modified roof system
  • Winter conditions
  • Co-ordination with other trades
  • LEED accredited building
  • Reflective coating on white modified membrane contributed LEED points
  • Included green roof which contributed to LEED points
  • Walk out balconies with architectural patio slabs as a walking surface

« Previous PageNext Page »