Bell Mobility, Mississauga

  • Three phases to complete
  • Roofed phase I in 2001 – 3 buildings – 104,200 sq. ft. inverted hot rubber roof system
  • Access to roof and hoisting of materials completed with tower cranes/mobile cranes to various roof levels in co-operation with other trades
  • Roofed phase II in 2003 – 80,400 sq. ft. EPDM roof system
  • Installed Living Wall in Phase III in 2008

Woolwich Residence

  • Completed 2001
  • 16,900 sq. ft.
  • New cedar roof
  • Custom fabricated copper flashings

City of Cambridge Civic Centre

  • Completed 2007
  • 22,500 sq. ft. new construction
  • Various multi-level roof areas
  • Torch applied inverted modified roof system with crushed limestone ballast
  • Extensive custom metal flashings
  • Winter conditions
  • Co-ordination with many other trades
  • Included green roof and Living Wall Biofilter
  • LEED accredited building, points from living roof and Living Wall Biofilter